The challenge
An investor wants to open a station without spending on construction before the permit is granted, coordinating the CNE, ASEA and the municipality at the same time.
How it's solved
The roadmap sequences the three tracks and their dependencies on a "paperwork before concrete" timeline: the filing first, then construction — protecting cash flow.
Illustrative scenario based on current regulations — it does not represent a specific client.
Start with your assessment
Tell us your situation and we come back with your roadmap and an estimate of time, cost or savings.
Request an assessment